Your fence is visibly leaning, and in Arlington that is the kind of thing the city can cite. Get a ballpark first, then a free, itemized quote from a local contractor.
Most Arlington homes were standing before 1990, and many fences are original or close to it. Near the university, brick ranches sit behind fences patched one panel at a time for years. Down south toward I-20, subdivisions are newer but their first fences are aging out together. Up in Viridian, the pattern flips: new houses and backyards still waiting to be closed in.
Fences Texas connects Arlington homeowners with a local fence contractor. You explain the job once, he measures it, and you judge the quote.
Rough footage is fine. No phone number needed for the estimate.
Board-on-board cedar privacy fence with trim and cap, built on a stone base.
Estimate my fence cost
Start with a ballpark for your yard. No phone number needed for the estimate.
Step 1 of 2: Your estimate
Homeowners across DFW get matched with local fence pros
What happens next
1
Run the numbers, then send the form.
The estimate works off your footage and asks for no phone number. When the range looks reasonable, send the form to request your free quote.
2
Your contractor calls to book the measurement.
He rings you to go over the job and pick a time to come out and measure.
3
A written quote follows the visit.
It lists removal, gates, and any permit as separate lines. Hire the contractor if it suits you, pass if it does not. Either answer ends the process cleanly.
When an Arlington fence stops being optional
Walk a central Arlington street near the university and count the fences held together with sister boards and hope. Then drive the Lake Arlington side, where big shaded lots mean long runs, and a leaning long run is a big check waiting. Then picture a Viridian backyard on closing day: fresh sod, close neighbors, and no barrier between your patio and theirs.
The ground does its part. Much of Arlington sits on clay that takes on water in spring and gives it back all summer, shrinking as it dries, and posts in that cycle slowly lose their grip. Parts of town grade toward sandier ground, which asks for a different set.
Ask the contractor quoting you: how will these posts be set so this fence stays plumb through wet and dry cycles?
What an Arlington fence costs, and what moves it
Start with footage, because it drives everything else. A long Lake Arlington run and a short Viridian backyard can take the same material and land at very different totals. Material is next: pine comes in at about half the per foot price of cedar, with iron between the two. Gates add their own line, and tear-out adds another on a replacement.
Nobody can price your yard off a city average, and Arlington has no one yard type to average. Use the calculator to turn your footage and material into a range in about half a minute. Treat it as a planning tool. The price you can hold a contractor to is the written one, after he measures.
Rough footage is fine. No phone number needed for the estimate.
You do not have to deal with any of the annoying parts
Arlington requires a permit for a new fence, and for a replacement covering more than half of a line, so most full jobs start with paperwork. Your contractor files for any required permit and builds to city rules as part of the job: height cap, front yard limits, and corner sight lines are his to get right. If your HOA needs approval first, he works through that with you.
One wrinkle: Pantego and Dalworthington Gardens sit inside Arlington on the map but are separate towns with their own permitting. If your house is in one, say so in the form and the contractor's call sorts out which rules apply. Utility lines get located through 811 before digging, and on a replacement the old fence is hauled off as part of the quoted work.
How getting matched works
1
Your contractor comes out and measures.
He walks the line, checks gates, corners, and slope, and builds the quote from that walk, with removal and any permit on their own lines.
2
The decision is a reading exercise.
The quote is written and itemized, so you can judge each line at your own table. Accept it and the job is his. Decline it and you owe nothing.
3
He builds it, then you inspect it together.
Walk the new fence with him, run the gates, and raise anything that looks wrong before final payment.
After you send the form: Your contractor will call within one business day to schedule your free measurement. He has read your form before he dials, so the conversation is about your fence, and it ends with a measuring visit booked. We do not robocall, we do not sell your number, and nobody will chase you if you pass. Every matched contractor backs the work with a one-year workmanship warranty in writing.
Cedar, pine, or iron in Arlington
Cedar earns its place on Arlington privacy fences. It handles the wet and dry cycle better than cheaper wood, and the city lists it among the approved privacy fence materials, with other wood pickets allowed only on metal posts. Pine is the lower cost route, at roughly half the per foot cost of cedar, for a shorter service life. Iron is the front yard answer, because Arlington front fences must stay open and see-through.
Arlington fence questions
What does a fence cost in Arlington?
Your footage and material decide it, and the calculator turns those two into a range in about half a minute. Roughly, pine costs about half as much per foot as cedar and iron sits in between, with gates priced separately. The exact number comes from the site visit.
How long does the whole thing take?
Most fences are finished within 2 to 3 weeks of the quote visit, and once the crew starts, most backyard fences go up in 1 to 2 days.
Do I need to be home?
For the quote visit, yes if you can, because gates and shared lines get settled fastest in person. On build days most people go to work as usual. The crew needs the yard open and a plan for pets.
What about the permit and my HOA?
The contractor handles both. Arlington requires a permit for new fences and replacements over half a line, and any required permit gets pulled as part of your job. If an HOA governs your street, mention it in the form.
How does matching work, and what does it cost me?
It costs you nothing. One form describes the job, and one local contractor measures and quotes it. You pay only the contractor you hire, for the fence he builds. If the quote misses your budget, you pass, and you are out nothing.
Only part of my fence is bad. Can I replace just that part?
Yes. Partial replacement is common in Arlington, especially on the older central streets. Tell us which run is failing and whether a neighbor shares it. One caution: replacing more than half of a line triggers the permit, and your contractor will flag that at the measurement if your job crosses it.
My fence is leaning. Can the city actually make me fix it?
Yes. Arlington requires owners to keep fences maintained, and a fence leaning well out of plumb or heavily damaged can draw a code case. Worth knowing before a small lean becomes a notice with a deadline. A measurement visit will tell you whether yours is a repair or a replacement.
Get your Arlington fence priced
One form, one contractor, one written quote. Crews fill spring and summer routes first come, so early starters choose dates instead of taking what is left. Start with the estimate.
Rough footage is fine. No phone number needed for the estimate.