Fence leaning toward the alley? Association letter on the counter? Skip the guessing. Get a rough estimate first, then a detailed written quote at no charge from an Irving contractor.
Irving is really two fence towns sharing one name. Down in the older streets, Plymouth Park and Irving Heights and the blocks around the Heritage District, the fences went up with postwar houses and a lot of them are gray and tired. Up north it is Las Colinas and Valley Ranch, where the fence you want has to satisfy an association before it can satisfy you, and the wrong board pattern or stain color can earn a polite letter and a deadline.
Fences Texas connects Irving homeowners with a local fence contractor who works both halves of this city. One submission is enough: he measures your line, prices it in writing, and leaves the decision with you.
Rough footage is fine. No phone number needed for the estimate.
Board-on-board cedar privacy fence with trim and cap, built on a stone base.
Estimate my fence cost
Start with a ballpark for your yard. No phone number needed for the estimate.
Step 1 of 2: Your estimate
Homeowners across DFW get matched with local fence pros
What happens next
1
Enter footage, view the estimate, submit.
Pick new build or replacement and type in a rough length. No phone number is required for the range. Submit the form to send the job forward.
2
The contractor calls to arrange his visit.
He verifies your address and scope with you, then sets a time to measure.
3
The quote arrives in writing, broken apart.
Removal, gates, and permit fees each appear separately. Hire him if the price works, decline if it does not, and keep the copy either way.
The fixed version, north side and south side
Picture a Valley Ranch yard on a canal lot, new cedar running straight along the water side, built to the pattern the association approved before the first post went in. Or a Plymouth Park backyard where the rotted wood came out one morning and a privacy fence stood by the next evening, and the dog got his yard back.
The rules differ by neighborhood. The ground does its own thing in both. Most of Irving sits on heavy clay, Eagle Ford shale clay in the south and east that swells after rain and shrinks hard in August, with Houston Black and Austin series clays in the mix. Toward Las Colinas the ground shifts to clay over Austin Chalk, which moves less but still moves. Irving's code answers part of the problem: new and replacement wood fences go on metal posts here, by law.
Ask any quoter: how deep are the posts, and set in what?
What an Irving fence costs, and how to find out for your lot
Footage is the biggest driver of the total. Material is next. Cedar carries the highest per-foot price among common choices, iron prices below it, and pine comes in lowest, at roughly half the per-foot money of cedar. Gates add on top, and a replacement means paying to take the old fence down and haul it away too.
The estimator here converts rough length into a planning range in about thirty seconds, fine for budgeting. A final price requires the site visit, where removal, gates, and permit costs are itemized instead of rolled into one lump sum.
Rough footage is fine. No phone number needed for the estimate.
Permits, association approval, and the old fence are not your problem
Irving requires a permit for any new or replacement fence, and the contractor must be registered with the city. Yours handles both. The city caps rear and side yard fences at eight feet and holds front yard fences to four feet with at least half the fence see-through. Your contractor builds inside those lines and calls for the final inspection.
In Las Colinas, the association layer sits on top of the city layer. Fencing is on the Las Colinas Association's own list of work needing Architectural Control Committee approval before anything starts, checked against the deed restrictions for your village. Valley Ranch runs its own review too. Your contractor obtains the city permit as part of the assignment, its cost shown on its own line, and routes association paperwork through the same process. Before posts go in, buried utilities get flagged through an 811 locate request. On a replacement, taking the old fence down and hauling it off appears as a priced item in the quote.
How getting matched works
1
The site visit comes first.
A contractor from the area measures the line, checks gate swings and corners, and notes whether your lot answers to an association. His quote states post depth and setting, metal posts included where code calls for them.
2
The decision stays yours.
Read each line at your own pace, then accept or turn it down. The quote stays yours, and no one keeps calling to change your mind.
3
Final walk before final pay.
After installation, inspect the completed fence together. Point to anything needing correction before handing over the balance.
Submitting the form sets a short sequence in motion. Your contractor will call within one business day to schedule your free measurement. On that call he goes over the scope with you and sets the visit. Your number stays private, it is never sold, and there are no pressure tactics. Every matched contractor backs the work with a one-year workmanship warranty in writing. Keep that paperwork with your quote.
Cedar, pine, or iron: the Irving short version
Cedar is the standard backyard privacy fence across Irving, and board-on-board is the pattern many association streets expect. Pine is the lower cost route, about half the per-foot money of cedar, and it weathers faster. Iron is the pick for front yards, where the city wants height down and visibility open, and for canal and golf course lots in Las Colinas and Hackberry Creek.
Irving fence questions
What does a fence run in Irving?
It comes down to footage and material. Try the estimator above: enter footage, get a budget range in about thirty seconds. Cedar prices highest, pine lowest at about half of cedar's per-foot rate, iron in the middle. Each gate adds its own charge, confirmed on site.
How long until my fence is done?
Most fences are finished within 2 to 3 weeks of the quote visit. Most backyard fences go up in 1 to 2 days once the crew starts. One caveat: lots needing association approval run on the association's calendar, so flag that early.
Must I be home during installation?
For the measurement visit, being present helps, since gate placement and boundary questions get answered on the spot. During construction, most homeowners go to work as normal. Just leave yard access and a dog plan.
Permit and association approval: who handles those?
The contractor handles both. He files for the Irving permit, builds to the eight-foot rear and side limit, and uses metal posts on wood fences as the city requires. In Las Colinas or Valley Ranch, he routes plans through association review first.
What do I pay for the matching service?
Zero. Submit one form and we pair you with a single Irving contractor, who provides the detailed quote. The contractor phones to go over the basics and arrange the measurement. Money only changes hands between you and the contractor you hire. Price not right? Decline and move on.
Can I replace just the failing side?
Yes, single-side work is common here. On the form, identify the side and note whether a neighbor shares that boundary, so it prices correctly, cost split included.
Get your Irving fence priced
Postwar street in south Irving or a canal lot in Valley Ranch, one form brings a contractor out to price your fence in writing. Crews book spring and summer work first come, so begin with the estimate.
Rough footage is fine. No phone number needed for the estimate.